Raymarine ST1000 Plus Dokumentacja Strona 43

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 76
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 42
Chapter 4: Installing the Tiller Pilot 41
Mounting the socket
Install the tiller pilot socket as follows:
1. Attach the template (provided at the back of this handbook) to the selected
bulkhead.
2. Carefully drill a 21 mm (
53
/
64
in) clearance hole for the cable boss.
3. Drill 4 pilot holes (2.5 mm or
3
/
32
in) for the self-tapping screws.
4. Remove the template.
5. Pass the power cable and any other cables (SeaTalk and NMEA) through the
bulkhead and the gasket.
6. Use a small flat-bladed screwdriver to connect the cable(s) to the socket –
refer to the illustrations on the following pages to identify the individual con-
nections on the SeaTalk socket. Ensure that the socket is oriented correctly
and note the connection numbers in relation to the keyway..
D3296-2
Cable
Gasket
Socket
Rubber cap
Screw
Plug
Floating nut
Retaining ring
Installed socket
81130_6.book Page 41 Wednesday, March 8, 2006 3:12 PM
Przeglądanie stron 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 75 76

Komentarze do niniejszej Instrukcji

Brak uwag